# The first week meeting
## Setting goals and weekly prograss
- The general goals were discussed. For the first three weeks, the general design should be accomplished. Allow two weeks for surface mounting and PCB fabrication.
- Clarify the divison of responsibility.
## Install relevant softerware
- Software for circuit simulation
- Software for PCB design
## Questions (Ask academic advisor)
## Outline
- Figure out the key **params of FDC**
- Think how to **measure** these params
- There might be a week to wait for the SMT
- In the waiting time, figure out **measure/test procedure and plan**
- Always think about the **Report**
- Use blog to provide `evidence` of proof
- Its better to conduct the proj **document-oriented** with a check list
## Technical Suggestions
- **Do not** need a bandpass filter at input
- **Do not** need a amplifer at input and output
- May need a bandpass near output
- Think how to design the output impandance to be **50ohms**
- The output bandpass may use **butterworth**
- The gain can be not considered
- The input can be designed to be any range between `300M-3GHz`, `1850-1910MHz` is ok